School work-order routing
A synthetic language challenge: simple substring rules versus live Jev, with every ticket available for inspection.
Read the experiment ↓- Format
- Research & findings
- Reading time
- 8 minutes
- Level
- intermediate
Before the first bell
Download the approved film (MP4, 13 MB)
Can a router read past the keyword?
An empty old-light-bulb bin sits beside recycling that needs collecting. The job is custodial; a light-related keyword can send it to electrical. We compared simple substring rules with live Jev classification on synthetic work orders. This study measures routing decisions against authored labels. It does not measure staff time saved, repairs completed, school safety, or dispatch outcomes.
Results: development and challenge set
| Batch | Substring rules | Live Jev |
|---|---|---|
| Development (32) | 31/32 | 32/32 |
| Challenge holdout (24) | 9/24 (37.5%) | 23/24 (95.83%) |
| Trade cases in holdout (18) | 5/18 | 17/18 |
| Review-required cases (6) | 4/6 | 6/6 |
The development batch was written alongside the rules. Its near-perfect scores are development evidence. The primary 24-case holdout was authored by a separate agent after the implementation and prompt were frozen. That writer had seen the rules. These are deliberately challenging language examples, including synonyms and irrelevant trade mentions, rather than a representative school inbox or a blind field evaluation. The agents share model lineage.
Method and policy
Six trade routes—plumbing, electrical, HVAC, carpentry, custodial and grounds—plus human review. Safety hazards, ambiguity and insufficient detail require review before trade assignment; negated hazards do not. The baseline lowercases text, checks a short list of hazard and uncertainty phrases, then returns the first matching trade substring. It has no learned semantics or word-boundary matching. A stronger rules baseline may do better.
Jev used the live jev-1.13.0 model through MCP. Each response was checked for served model and a complete valid probability distribution. Calls were sequential in fixed ticket order, five-second timeout, no retries. Rules ran first, Jev second; there was no counterbalancing or repeated trial. Labels were loaded after both inference arms finished. No rules or thresholds were tuned after holdout results.
Accuracy came with added latency
For all 24 tickets, rules took under 1 ms and Jev took 3.86 seconds. The recorded wall times were 0.0005215 and 3.856334083 seconds respectively. Rules timing is an in-process CPU microbenchmark that excludes inbox ingestion, startup, dispatch and human review. Jev wall time includes MCP launch, credential lookup, tool discovery, sequential calls and shutdown. Neither arm had an error or timeout. These timings are different execution envelopes and do not establish operational throughput or a speed advantage. No human handling time was measured.
Two tickets worth reading
H10
The waste bin marked “old light bulbs” is empty. The ordinary recycling beside it is overflowing and needs collecting.
The old-light-bulb bin was empty; the recycling nearby needed collection. Rules chose electrical. Jev correctly chose custodial.
H17
The lock is fixed. Would someone sweep up the sawdust left on the office floor?
After a lock repair, sawdust needed sweeping. Rules chose carpentry. Jev deferred to review; the authored label was custodial. This unnecessary referral was Jev’s sole disagreement.
Across the holdout, rules directly assigned five wrong tickets, including two that required review. Jev made zero wrong direct assignments and one unnecessary referral. Rules deferred 14 tickets to review; Jev deferred seven. These counts describe this challenge set and do not establish safety in operation.
Inspect every decision
The download includes all 24 synthetic tickets, authored labels, both choices, correctness, per-call timing, Jev distributions, served model, usage and request hashes.
- Download all per-ticket evidence (JSON)
- Download the route and safety policy
- Download the exact substring baseline
Read all 24 ticket decisions
H01
We're out of paper towels in both dispensers outside the music room.
Expected: custodial · Rules: review · Jev: custodial
H02
The row of lamps above the whiteboard stays dark even after I change the bulbs.
Expected: electrical · Rules: review · Jev: electrical
H03
The metal cover on the socket is warm and smells scorched.
Expected: review · Rules: review · Jev: review
H04
Could someone prune the branches hanging over the outdoor reading benches?
Expected: grounds · Rules: carpentry · Jev: grounds
H05
The radiator in 2B stays stone cold even when the rest of the building warms up.
Expected: hvac · Rules: review · Jev: hvac
H06
The latch on the supply closet no longer catches.
Expected: carpentry · Rules: review · Jev: carpentry
H07
The staff washbasin empties so slowly there's still a bowlful after lunch.
Expected: plumbing · Rules: review · Jev: plumbing
H08
We keep hearing a thump above the ceiling tiles. We haven't located it.
Expected: review · Rules: review · Jev: review
H09
The socket behind the projector cart is dead. We've tested the cart elsewhere.
Expected: electrical · Rules: review · Jev: electrical
H10
The waste bin marked “old light bulbs” is empty. The ordinary recycling beside it is overflowing and needs collecting.
Expected: custodial · Rules: electrical · Jev: custodial
H11
The door to the kiln room shuts fine. Its wooden sill has split and needs replacing.
Expected: carpentry · Rules: carpentry · Jev: carpentry
H12
Yesterday's leak has stopped, but there's moisture inside the outlet plate.
Expected: review · Rules: electrical · Jev: review
H13
The hedge beside the kindergarten courtyard is growing through the fence.
Expected: grounds · Rules: review · Jev: grounds
H14
The handle on the kitchenette faucet spins freely and the flow won't shut off.
Expected: plumbing · Rules: review · Jev: plumbing
H15
The air from the heating vent comes out chilly all morning despite the setting.
Expected: hvac · Rules: hvac · Jev: hvac
H16
Report says “it's broken again” with a room number and no description.
Expected: review · Rules: review · Jev: review
H17
The lock is fixed. Would someone sweep up the sawdust left on the office floor?
Expected: custodial · Rules: carpentry · Jev: review
H18
The cafeteria pendant lamps never come on, even with fresh bulbs.
Expected: electrical · Rules: review · Jev: electrical
H19
A loose wooden bookcase bracket needs securing in the reading corner.
Expected: carpentry · Rules: review · Jev: carpentry
H20
Please rake the fallen leaves off the athletics path before practice.
Expected: grounds · Rules: grounds · Jev: grounds
H21
The emergency exit bar moves, but nobody can get the door open from the hall.
Expected: review · Rules: carpentry · Jev: review
H22
The bottle filler above the drinking fountain gives a thin trickle.
Expected: plumbing · Rules: plumbing · Jev: plumbing
H23
The puddle under the air handler could be condensation or a cracked supply line. Which crew should look?
Expected: review · Rules: review · Jev: review
H24
The thermostat display works, but the radiators in the entire east wing stay cold.
Expected: hvac · Rules: hvac · Jev: hvac
What this supports—and what comes next
Live Jev handled this synthetic language challenge more accurately than these simple substring rules, while adding latency. Twenty-four selected cases, one run, a weak baseline and synthetic labels cannot establish general superiority, production safety, cost, capacity or ROI. The optional OpenAI Decisions comparison was not run because an authorized API key was unavailable.
Before deployment, facilities operators should adjudicate disagreements, test a representative consented inbox sample, compare a stronger production baseline, repeat and randomize trials, and measure the full review and dispatch workflow. No real tickets were dispatched and no staff outcomes were observed.